With the geographical and population growth of Watford City the need for the capability to provide response to multiple concurrent emergencies resulted in acquisition of additional firefighting apparatus and medical response units. The expanded emergency vehicle fleet required that a facility for their storage be provided in addition to the existing fire station. The new 6,394 SF facility includes a 640 SF classroom, kitchen, two storage rooms, two offices, reception area, restrooms, and six equipment bays.
Heating and cooling of the facility is provided by hydronic in-slab heating and dual fuel roof mounted heat pumps. The hydronic heating system also extends to the concrete apron extending along the front of the building at the apparatus bay doors.
Flathead Valley Office |
Gallatin Valley Office |
Columbia River Office |
406-755-3208 |
406-586-0707 |
360-852-8746 |
2250 Hwy 93 South | 705 Osterman Drive, STE B | 702 Jefferson Street |
Kalispell, Montana 59901 | Bozeman, Montana 59715 | Vancouver, Washington 98660 |